Up to 3 Days Free Trial — no card, no obligationNo card requiredFemale supervisor in every classClasses 24/7 in your time zoneBook now →

Live one-to-one classes

Online male Quran teacher for your son

Want a male teacher for your son? Choose one when you book, and your son keeps him every lesson. Same price, same safety rules.

  • One-to-one live classesPersonal attention for your child.
  • Female supervisor in every classShe listens to the whole lesson.
  • Male or female teacherYour preference, any time.
  • Classes 24/7Learn at a time that suits you.

Book a free trial class

Give your child a positive start with a 1-on-1 live Quran class. No payment needed.Up to 3 Days Free Trial · No card needed

How old is your child?
  • No card required
  • No obligation
  • Female supervisor
Add email, teacher and time (optional)
Preferred teacher

Up to 3 Days Free Trial. No card, no obligation. We confirm your class time on WhatsApp.

4.8 / 5from 72 reviews on Trustpilot · 5.0 on Google
Age 4+Children only, one-to-one
24/7Classes in your time zone
From $30a month, after a free trial of up to 3 days

Male Quran teacher

Can my son have a male teacher?

Yes. Choose a male teacher when you book, and your son keeps the same teacher every lesson. Male teachers teach the Qaida, Quran reading, Tajweed, Hifz, Quran translation and Tafseer, Islamic studies and Arabic, one-to-one online. A male teacher costs the same as a female teacher, and you start with a free trial of up to 3 days.

  • A female supervisor in every class

    She listens to every lesson he gives your son, from start to finish.

  • You can always look in

    Join any lesson without telling us first, or ask for the recording.

  • Change teacher any time

    If he is not the right fit, we change him. You do not have to say why.

Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

Kind, checked teachersID, certificates and a watched demo before they teach a child.

“I just tried one session with my son, and I was honestly amazed by how much he enjoyed the class! The teacher was so sweet, encouraging, and engaging.”

★★★★★ Sofia Malik, United States · Trustpilot

What can a male teacher teach my son?

Any of these, one-to-one. Your son starts where he is now, from the first letter to Hifz.

  • Age 4 to 10

    Noorani Qaida

    Letters and sounds from the very first lesson, with our own OQLS Qaida.

    Start Noorani Qaida
  • Age 4 to 16

    Quran reading

    Reading the Quran itself, once the Qaida is done.

    Start Quran reading
  • Age 7 to 16

    Tajweed

    Each letter from its right place, corrected word by word.

    Start Tajweed
  • Age 6 to 16

    Hifz

    Memorising by heart, with new lines and revision in every class.

    Start Hifz
  • Age 4 to 14

    Islamic studies

    Salah, duas, the stories of the prophets and good manners.

    Start Islamic studies
  • Age 5 to 15

    Arabic

    Reading, writing and understanding Arabic words.

    Start Arabic

How long does it take?

It depends on the course, your child’s age and how many classes a week they take. After the first week the teacher gives you an honest estimate, and your monthly report shows the progress.

How many days a week?

From one to five, 30 minutes each, at times that suit you. You can change the number of classes from the next month.

Looking for a female teacher for your daughter? See our female Quran teachers

Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

Course finder

Not sure where to start? Two taps.

1. How old is your child?
2. Can they read Arabic yet?

Answer the two questions and we will suggest a course and how many classes a week.

Where does my son start?

Pick the one that sounds like your son. The teacher checks it in the free trial.

  • My son has never read Arabic

    Starts the OQLS Qaida from the first letter and its sound.

    Try Up to 3 Days Free
  • My son reads, but makes mistakes

    Reads the Quran with Tajweed, and his teacher corrects every word.

    Try Up to 3 Days Free
  • My son reads well

    Begins memorising short surahs, then Hifz when he is ready.

    Try Up to 3 Days Free

What are the class details?

Everything to know before you book, in one place.

What are the class details?
TeacherMale, the same one every lesson
FeeFrom $30 a month, the same for a male or female teacher
Lesson30 minutes, live and one-to-one
In every classA female supervisor, listening
AgesFrom age 4 up to teenagers
Times24/7, in your time zone
Explained inEnglish or Urdu
ProgressA report every month
You needA laptop, tablet or phone, internet and headphones with a mic
BooksNothing to buy. Pages are shared on screen
To startUp to 3 Days Free Trial, no card
Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

Book a free class for your child

Up to 3 Days Free Trial. No card needed. A female supervisor in every class.

How old is your child?

Takes a minute · We confirm the time on WhatsApp

How are male teachers checked and supervised?

Every teacher, male or female, passes the same four checks before a first student.

A live class with a male Quran teacher: a Qaida page on screen, the male teacher, your son and a female supervisor listening
Every class: the page on screen, the teacher, your child, and a female supervisor listening.
A female supervisor in every class

A female supervisor joins every lesson live and listens to the whole class, from salaam to the last ayah.

So even with a male teacher, a woman listens to every lesson your son has.

  • Join any class, unannouncedParents can sit in on any lesson live without telling us first.
  • Ask for the recordingLessons are recorded. Ask for your child’s recording whenever you want to hear a class again.
  • No contact outside classTeachers never message a child outside the lesson. Every message goes through our team to you.

Before a teacher meets your child

  1. Identity verifiedNational ID card or passport checked by our team.
  2. Police checkA government criminal-record (police) check from the country where the teacher lives.
  3. Certificates checkedQuran and Tajweed qualification certificates are seen and checked.
  4. Interview and a watched demoAn interview, then a demo class that our team watches from start to finish.
  5. Trained in our methodTraining in the OQLS way of teaching children before a first student.

Our teachers are mostly based in Egypt, the UAE, India and Pakistan. Every teacher holds a government police check, we check their ID and certificates before they teach, and a female supervisor joins every class. Read our child safety rules

Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

Will my son keep the same teacher?

Yes. Your son keeps the same teacher at the same time each week, so they build trust. If something needs to change, this is how it works.

A sample monthly progress report from a male Quran teacher
A progress report every month: the lesson, what is going well, what to practise.
Change teacher
Just ask, at any time. You do not have to give a reason. You can also move to a female teacher, at the same price.
Move a class
Message us on WhatsApp as early as you can. We find another time, with the same teacher where possible.
If the teacher cannot make a class
Any class missed on our side is refunded or taken off next month’s fee.
If your son misses a class
Tell us before the class, then choose a make-up class or have the fee adjusted next month. A class missed without telling us cannot be made up.
Stop any time
There is no contract. Ask within 5 calendar days of the first paid class for a full refund.
Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

How do I book a trial with a male teacher?

Book in a minute, meet the teacher in a free trial of up to 3 days, then decide. You pay month by month, so you can change anything later.
  1. Book in a minuteTell us your child’s age and your WhatsApp number. That is all we need.
  2. Agree a time on WhatsAppWe message you to agree a time in your time zone. A male teacher is already chosen for you.
  3. Free classes on up to 3 daysThe teacher finds your child’s level and teaches real lessons: one to three free classes, as many as your child needs. No card, no obligation.
  4. Then decideCarry on with a monthly plan, or stop. There is no contract.
Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

How many classes a week can my son have?

From one to five classes a week, 30 minutes each. Three or four a week keep each lesson fresh; five suit Hifz.

Same price: a male teacher costs exactly the same as a female teacher.

  • A female supervisor in every class
  • Male or female teacher, same price
  • A progress report every month
  • Every lesson recorded, ask any time

Prices in US dollars. Paid monthly. No enrolment fee, no contract. Every plan starts with the free trial, and you choose the number of classes after it.

What parents say

4.8out of 5 from 72 reviews on Trustpilot · 5.0 on Google

★★★★★

Hooked in first session

“I just tried one session with my son, and I was honestly amazed by how much he enjoyed the class! The teacher was so sweet, encouraging, and engaging.”

★★★★★

Great experience

“My son enjoys the online Arabic class and is learning a lot. The teacher is kind, patient, and explains well.”

★★★★★

Kids are under an organised structure

“Happy for my kids that they are studying in an organised structure where both teacher and students are under supervision… Receiving the progress status of kids after the class.”

★★★★★

Alhamdhulillah. Glad I found this institute.

“Class is flexible… Supervisor is in the class for safety of both the sides.”

★★★★★

I am very impressed with the teaching

“My kids have learnt so much within such a short space of time. Very impressed would definitely recommend.”

★★★★★

“We are 2 sessions in and the kids are highly engaged. Great way for them to spend their evenings and get closer to Allah.”

Read every review on Trustpilot
Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time

Male teacher questions

Anything else? Ask us — we answer on WhatsApp.

Try Up to 3 Days Free
  • No card needed
  • One-to-one
  • Stop any time
Does a male teacher cost more?

No. Male and female teachers cost the same, on every plan.

Is there a supervisor even with a male teacher?

Yes. A female supervisor listens to every class, whichever teacher you choose.

Do male teachers explain in English?

Yes. Lessons are explained in English or Urdu, so your son understands every correction. The reading itself is always in Arabic.

Can my sons learn together?

Not in the same class. Each son has his own one-to-one class, often back to back, so each learns at his own level.

Can my daughter have a male teacher?

Yes, it is your choice. We also have female teachers, at the same price, if you would rather she learns with a woman.

8 more questions
How do I ask for a male teacher?

Book with any form on this page. A male teacher is already chosen on it. You can also tell us on WhatsApp when we message you.

What happens in the free trial?

The teacher meets your son, listens to him read and teaches real lessons: one to three free classes on up to 3 days, as many as he needs. Then you decide. There is no card and no obligation.

Are the classes live or recorded?

Live, always. Your child reads with a real teacher on a video call, never a recorded course. Lessons are also recorded, so you can ask for the recording any time.

Can the teacher contact my child?

No. Teachers never message a child outside class. Every message goes through our team to you.

What do we need for a class?

A laptop, tablet or phone, a steady internet connection and headphones with a mic. A quiet spot at a table helps.

Is the free trial really free?

Yes. Up to 3 Days Free Trial: one to three free 30-minute classes on up to 3 days, as many as your child needs to find their level. No card, no obligation. You only pay if you decide to continue.

What is your refund policy?

Ask within 5 calendar days of the first paid class for a full refund. After that, we charge only for the classes your child attended and return the rest.

What if we want to stop?

The trial has no obligation. After that, ask within 5 calendar days of the first paid class for a full refund. After that, attended classes are deducted and the rest is refunded.

Up to 3 Days Free Trial

Up to three days free with a male teacher

No card, no obligation. A male teacher is already chosen on the form.

  • The teacher finds your child’s level in the first class
  • A male teacher, already chosen on the form
  • Class times 24/7, in your time zone
  • A female supervisor in every class

No card · Nothing to cancel · Confirmed on WhatsApp

Book your child’s free trial

No card needed. We message you on WhatsApp to agree a time.

How old is your child?
  • No card required
  • No obligation
  • Female supervisor
Add email, teacher and time (optional)
Preferred teacher

Up to 3 Days Free Trial. No card, no obligation. We confirm your class time on WhatsApp.